How long does it take to do ceramics?
How long does it take to do ceramics?
1.Sculpturing
There are 3D printed make sculpturing and make sculpturing by hand. The 3D printed make sculpturing take 1-2 days. It only need 3D file make sculpturing.
The make sculpturing by hand normal need 3-5 days. It is average time. Because factory need check with customer every details whether satisfied.
2.Mould Making
The Ceramic product mould normal make by gypsum. The one mass production mass mould only can make 50-80 pcs product (It depend on product texture).
It take 5-7 days.
3. Make Clay Body
There are pouring by hand, roll forming, pressure. Pouring by hand normal use for irregularity. Roll forming normal use for mug, cup bowl, The pressure normal use for plate.
It take 10-20 days. The pouring is slowest.
4. Demoulding
It take 2-5 days.
5. Slip Casting
The Slip Casting is repair problem clay body. It take 2-5 days.
6.Bisque Firing
First time fired. It take 1-3 days. Some customer like bisque DIY product.
7.Painting, Glazing
There are hand painted and glazed. The hand painted is slowest and expensive.
8 Glost Firing
Second time fired. It take 1-3 days.
9 Decal Printed
The Decal printed is most common method. Normal use for logo, printed. It take 1-3 days.
10 Decal Fired
Third time fired. There are decal printed don't need fired. but it unstable. It take 1-3 days.
11 Inspection
We have QA inspection defective product. It take 1-3 days.
12 packaging
Packaging product depend on customer requirement. It take 1-3 days.
13 Storage
Storage packaging complete product until predetermined shipping container.
14 Delivery
Delivery to port. It take 1-2 days.